
Stabilisation works on the old road between Limassol and Paphos, near Aphrodite’s Rock (Petra tou Romiou) are expected to be completed by the end of July , Transport Minister Alexis Vafeades said on Friday during an inspection visit to the site.
Vafeades told journalists that the Aphrodite’s Rock area was one of the most emblematic sites in the country, but that due to the poor condition of the subsoil in